WT4 WALLSTYL®
Indirect lighting
Brand :
NOËL & MARQUET
Assortment : WALLSTYL
/ 1 piece (2 m)
The smooth curve of the WT4 coving is a pleasing feature piece. This elegant and simplistic moulding lends itself to even the most dynamic of interior styles. It’s possible to use the WT4 WALLSTYL® cornice as a LED lighting source to create a warm and inviting atmosphere. The WT4 coving can be used to creatively play with the effects of shadow and light.
Advantages of WT4 WALLSTYL®:
- Made in Belgium
- Impact-resistant
- Water-resistant
- Pre-primed and ready to paint
- Provides a clean, protective and decorative finish
The WT4 WALLSTYL® cornice has a groove at the back of the piece, which can be fitted with LED lighting strips for hidden light sources. The covings can be placed at a range of angles on the wall, to change the effect of light on an interior. Thanks to the lightweight yet strong material, installation is a simple process. The WT4 WALLSTYL® cornices arrive primed and ready for a final coat of paint.
Product information
Dimensions
70 x 180 x 2000 mm
Packaging unit
4 pieces (8 m)
SAP
3000306
EAN
5412938527200
Product type
Indirect lighting
Related products
/1 bag (8 pieces)
Applications
Ceiling
Cornices as decorative elements between the ceiling and the wall. Rosettes that transform the style of your interior.
Wall
Wall decorations, panels, tiles, wall roses and picture rails to give your interior a touch of modernity.
Floor
100% water- and impact-resistant renovation baseboards and over-baseboards, suitable for your daily activities.
Lighting Solutions
Cornices, picture rails, baseboards, and wall decorations to combine with direct or indirect lighting for a cozy atmosphere.